29/11/2021
4,000 sq meters of substrate blasted
4,000 sq meters of substrate blasted back to SA 2.5 and primed.
24/06/2020
95 meter super yacht
3,000 sq meters of filler removed from hull and superstructure of a 95 meter yacht.
29/11/2021
4,000 sq meters of substrate blasted back to SA 2.5 and primed.
24/06/2020
3,000 sq meters of filler removed from hull and superstructure of a 95 meter yacht.